How the application deploys and runs.
A five-phase deployment sequence, from data connection to board-ready report, completed in 2 to 4 weeks, producing outputs updated on each pipeline run.
1
Phase 01. Ingest & Validate (3–7 days)
Read-only connectors pull case ID, timestamp, and activity from client systems and normalize the schema. The onboarding framework validates data completeness and generates a feasibility report before the pipeline runs.
2
Phase 02. Process & Discover (5–10 days)
The Alkhai analysis engine runs inside the client environment, producing a process flow graph, variant analysis, conformance checks, rework loop detection, and outcome correlations.
3
Phase 03. Detect & Segment
Every transition is scored by system-wide impact. Root cause segmentation decomposes each bottleneck across business dimensions: resource, channel, product type, submission timing, to identify what is specifically driving the delay.
4
Phase 04. Recommend & Simulate
Each bottleneck produces a specific, quantified recommendation with annualised ROI. Automation opportunities are scored on four measurable feasibility factors and matched to the appropriate automation technology.
5
Phase 05. Report & Deliver (2–3 days)
The application generates a process health score, executive narrative report, and sequenced roadmap. All findings are updated on each pipeline run and published to the internal view or export layer.
Optional
Implementation support, available after delivery
The core engagement ends at delivery. If needed, we can support execution of specific constraints after the plan is delivered. This is tightly scoped, constraint-specific, and structured around the ranked outputs. It is not an ongoing retainer.
